Utrecht | Kruisvaartbrug | Busbaan


  • Project number: 14-119
  • Length: 13.4m
  • Width: 11.8m
  • Class: Eurocodes
  • Construction year: 2014

On Friday afternoon, 10 July 2014, the FRP bridge deck for the Kruisvaartbrug was transported to Utrecht. The 15 m long bridge section, completely produced with InfraCore® Inside technology, was transported by boat from Rotterdam, before being transported through the city center to its final destination.