Assendelft | Watergouw


  • Project number: 17-264
  • Length: 8.7 & 11.3m
  • Width: 4.5 & 1.5m
  • Class: Eurocodes & 5kN/m2
  • Construction year: 2018

Up, up, and away! For client Duss Projects and Sallandse Wegenbouw Griekspoor lifted these two FiberCore FRP bridges high through the air to their final destination in the new-build district Watergouw in Assendelft. Due to the light weight of the bridges, the crane was able to continue to operate and the nuisance for local residents was kept to a minimum. This is a traffic class bridge and a bicycle / pedestrian bridge.