Maastricht | Belvédere | Noordbrugtracé


  • Project number: 18-334
  • Length: 21.7m
  • Width: 4.5m
  • Class: 5kN/m2 + service vehicle
  • Construction year: 2018

Early in the morning, together with Strukton, we installed this FRP prefab cycle bridge with InfraCore® Inside technology on the Noordbrug route in the municipality of Maastricht. Artwork H is the pedestrian and bicycle bridge that connects the Bosscherweg with the Lage Fronten and the Noorderbrug cycle path.

In this item from Infra360, Struktons Mark de Vries explains the choice for a composite bridge from FiberCore Europe: