Polen | Czorsztyn


  • Project number: 19-372
  • Length: 27m
  • Width: 3.4m
  • Class: 5kn/m2 + service vehicle
  • Construction year: 2019

A total of eight InfraCore® Inside bridges have been installed by FiberCore agent Rozenblat on the beautiful cycling route around Lake Czorsztyn. The bridges could be placed with minimal inconvenience without affecting the beautiful surroundings .

Meet our agent

This project was managed by Rozenblat, our agent for Poland.